25
ENGLISH
INSTRUCTION MANUAL
Connect the wires (15, 16) to each other.
Connect the tension cables (12, 17) to each other.
Attach the vertical rod (9) to the main unit using
the bolt (13) and curved washers (14).
Attach the left and right vertical tubes (24L, 24R)
to the vertical bar (25) using bolts (25), washers
(26) and cap nuts (20).
Screw the left and right pedal rails (18L, 18R)
firmly to the crank using the bolts (19, 20) and
tighten them securely using a spring washer and
lock nut.
Assemble the pedal rails (18L, 18R) and the
vertical tubes (24L, 24R) using bolts (21), washers
(22), lock nuts (23) and caps (20).
Attach the left and right pedals (27L, 27R) to the
pedal rail (18L, 18R) using bolts (28), washers
(29) and nuts (30).
Screw the exercise handles (32L, 32R) securely to
the vertical tubes (24L, 24R) using square-headed
bolts (36), curved washers (34) and cap nuts (33).
Summary of Contents for 17112
Page 33: ...33 EXPLODED VIEW...