43
ENGLISH
COVERING INSTALLATION MOON/SPACE
Phase A
This phase presents the stove after being unpacked and
positioned in the room
Phase B
Remove the front panel (69) to remove the two screws
holding the upper right (51) and left (49) cast iron front
panels
Phase C/D
Assemble the plates (140) to the stone sides "A-B" (47)
with TE M 6x12 screws supplied and point in the 4.2 x
9.5 self-tapping screws without tightening them to the
two front and rear locking brackets (141-142-152-153)
to the structure.
Now insert the stone side (47), first inserting it in the
rear part "C" and then turning it and resting it on the
upper part, fitting it in the front bracket "D" (141-152).
Now tighten screws, which were previously pointed in,
on the front and rear locking brackets (141-142-152-
153).
Note:
During the assembly phase of the stone series, check that
the stones are aligned with the cast iron top. If they are
not, or rather they are within a few mm, a flat washer
must be placed between the side stone and the centring
bracket (151) to compensate for the indentation of the
coating.
Phase E
Assemble the cast iron front panel (53) and bracket
(151) to the upper front panel (69) with screws (71) pro-
vided, then reposition "G". Unscrew the two screws
(58) and remove the lower profile "H" (52). Assemble
the cast iron front panel (53) and bracket (151) to the
lower front panel (52) with screws (71) provided and
then place it in its housing and screw "I".
Phase F
Replace the two upper right (51) and left (49) front
panels and screw the front with the previously removed
screws.
Position the front grille (69) by pressing
Phase G
Position the cast iron top (78), the three pads (74) in
their housing, then place the stone top (79) over.
Phase H
The stove is now ready to be positioned.
ASE 3
A
B
C
D
A
D
B
C
C
C
B
A
A
D
D
47
47
47
47
140
142
140
140
140
142
141
141
43
42
151
151
151
151
151
69
69
71
53
E
G
52
53
58
71
58
L
H
L
I
F
74
74
78
79
Phase A
Phase C
Phase H
Phase E/F
Phase D
Phase B
Phase G
152
153