45
ENGLISH
COVERING INSTALLATION VINTAGE
Phase E
Installation of the ceramic intermediate side compo-
nents
Place the ceramic component parallely along the side,
fitting the housings 8 (at the ends of the front edge) into
the fastening brackets (6).
Slide the ceramic component towards the rear of the
stove until it fits completely on the brackets.
Reassemble the rear intermediate sheet metal profiles
(4).
Adjust the position of the ceramic component using the
adjustment screws (V); the adjustment screws are loca-
ted under each lower fastening bracket (7).
Phase F
Assembly of lower and upper ceramic side compo-
nents
Place the ceramic component parallely along the side,
fitting the housings 8 (at the ends of the front edge) into
the fastening brackets (6).
Slide the ceramic components towards the rear of the
stove until they fit completely on the brackets.
Reassemble the front intermediate sheet metal profiles
(3-5).
Adjust the connections and alignments (only the upper
ceramic component) using the adjustment screws (V);
the adjustment screws are located on top of each upper
fastening bracket (7).
Phase G
ceramic top assembly:
Place the ceramic top (10) over the cast iron stove top
V V V
Phase F/G
8
9
7
6
6
6
7
7
3
5
3
5
4
10
Phase E