51
ENGLISH
INSTALLATION
3rd SOLUTION: KIT 10 (code 643890) con KIT 10 BIS (code 645690) - BOTH ROOMS
Note: THE PIPES ON THE HOT AIR OUTLETS MUST BE FITTED BEFORE APPLYING THE COVE-
RINGS AND PRIOR TO DISASSEMBLY OF THE UPPER CAST IRON SIDE FLANK. THE FIRST PART OF
THE FLEXIBLE PIPE MUST BE COMPLETELY "RELAXED" IN SUCH A WAY TO ELIMINATE CORRU-
GATION. IN THIS WAY, THE INTERNAL DIAMETER WILL BE SLIGHTLY ENLARGED TO FAVOUR
ENTRANCE.
- Define the position of the stove with respect to the walling (fig. a).
- Disassemble the upper part of the back (132) and remove the predrilled caps in correspondence with the hot air
outlet pipes (fig. b).
- Activate the hot air channelling control lever (13), removing the locking plates (133) (fig. b).
- Cut the flue cover to size (6) on the wall side (fig.c)
- Place the stove in its definite position.
- Extend the aluminium pipes (2-3) for hot air channelling, without connecting them to the stove outlets.
- Fit the medallions (5) on the aluminium pipes and the pipe covers (6) without locking them in (fig. c).
- Fit the aluminium pipes to the hot air outlets on the back of the stove (8) (fig. d).
- Replace the upper part of the back (132).
- Place the pipe covers (6) in the definite position and fasten them to the back of the stove with the supplied screws (7) (fig. d).
- Install the terminal outlets (4) and relative aluminium pipes (2-3), fastening them with the wall collars (9) and
the dowels with screws (10-11)(fig. d).
- Fasten the wall medallions (5) with silicone (fig d).
n°
KIT 10
KIT 10 BIS
1
Box
1
645740
643910
2
Ø 10 pipe
1
-
643900
3
Ø 10 pipe
1
162520
-
4
Smoke outlet end-piece
2
293430
293430
5
Wall medallion
2
644190
644190
6
Flue cover
2
644140
644140
7
Flue cover fastening screws
8
168260
168260
8
Pipe blocking clamp
4
46160
46160
9
Wall collar
2
-
645750
10
Screws
4
-
8410
11
Dowels
4
-
8520
132
132
13
133
fig. b
3
2
5
6
4
4
8
6
8
8
5
5
5
7
10
3
2
4
4
9
9
5
5
6
6
10
8
8
9
9
8
6
7
5
5
4
3
2
1
6a
6
6a
10 11
fig. a
fig. c
fig. d