3.3.1 Base plan, static load and weights
Picture 3
– Base plan
Power (kVA)
10
15
20
30
40
3/1 / 3/3
L1 (mm)
450
P1 (mm)
640
L2(mm)
-
The supporting base of the UPS must be designed to carry the UPS weight and to ensure its
steady and safe support.
Its carrying capacity must be adequate to the static loads indicated in the table below.
Power (kVA)
10
15
20
30
40
3/1 / 3/3
3/3
Weight without battery (kg)
100
110
140
Weight with battery (Max) (kg)
285
275
-
Static load without battery (kg/m
2
)
347
381
486
Static load with battery (Max) (kg/m
2
)
989
954
-