Installation and start-up of UPS PEGASUS II
10-40 kVA
48
Rev.A 15/05/2012
4)
After the connection re-insert the battery trays as shown in picture 20.
Picture 20
– 7Ah/9Ah/12Ah battery connected
Put back and fix the front cover with the six screws.
Battery voltage
After the battery installation,
before closing BCB,
check the battery voltage on the
BCB circuit breaker and connect battery cabinet to the UPS as indicated on 4.5.3
paragraph.
Picture 21
– Battery circuit breaker and fuses