ER6-1400V1.01
Industrial Robot Quick Operation Manual
8
power aerial plug
control cabinet and the body
10900001122
2
PC
accessories (bracket,
pin)
\
1
SET
has been installed on the
robot body
Instruction QR code
\
1
PC
Safety door bridge
connector
10900020261
2
PC
Customers prefer
Note: the above is the standard configuration list, excluding customized models.
2.2.2 Preparation work before installation
This section is intended for the first time to open the box and install the robot. It also contains useful
information needed in the process of reinstalling the robot later.
Before the robot installation, the following inspection items shall be carried out:
Table 2-2 Precautions before installation
1
Visually check the robot to ensure it is not damaged.
2
Ensure that the lifting device used is suitable for handling the specified robot
weight.
3
If the robot is not directly installed, it must be stored according to the
requirements of the robot storage environment.
4
Ensure that the expected operating environment of the robot meets the
requirements of the robot operating environment.
5
Before transporting the robot to its installation site, please ensure that the site
meets the ground installation requirements.
6
Before moving a robot, please check the stability of the robot.
7
After these prerequisites are met, the robot can be transported to its installation
site as described in the following sections
。
2.2.3 Robot storage environment
The following table shows the allowed robot storage conditions:
Table 2-3 Robot storage environment
Parameter
Value
Minimum ambient temperature
-40℃