Sleeve for power cable
Place: Reverse side of the device
Function: For connecting the mains lead with power supply
Socket for foot-operated switch
Place: Left side of device
Function: Mixing process start with pressing
5 Bringing the machine into service
5.1 Preparation of the silicone containers
Material reservoirs, 1 L bottles or cubitainers can be connected with the egger ESG 2.
MATERIAL RESERVOIR: The supplied material reservoirs, labeled with A and B are
equipped with quick coupling.
BOTTLES: Open the bottles with the components A and B and apply bottle adaptor.
ATTENTION:
Colored bottle adaptor onto the bottle filled with colored silicone mass -
component B.
CUBITAINER:
Take off canister lids and screw optional connection hoses.
ATTENTION: Keep the two silicone components always separated - do not inter-
change connections! In case the two components have been mixed the silicone
cures in the unit which makes considerable repairs in our plant necessary.
5.2 Filling of the unit
Remove the lock caps from the coupling plugs.
Press the quick-coupling of the material reservoir or of the
silicone containers onto the coupling plugs of the unit and
let them snap hearably.
At first operation, hoses must be filled with silicone by pressing the button as long as
silicone is transported to reach the mixing head.
Page 10 of 16
Summary of Contents for ESG 2
Page 13: ...Seite 13 von 16 Page 13 of 16...