Smart. Solar
. Box
www.pleion.it
31
Smart. Solar
. Box
Smart. Solar
. Box
Programmed maintenance
Even programmed maintenance must be carried out by a qualified company; the manufactu-
rer will not recognise any guarantee rights if done by other people.
Periodically check (at least once a year) the correct functioning of the safety and non-return
valve and the bypass valve, because in the case of water that is particularly hard and/or has
a high impurity content, there could be loss of sealing and jamming of the valve with serious
consequences for the integrity of the accumulation tank.
In this case it will be necessary to:
- install a softening or filtration device upstream from the system;
- carry out adequate cleaning and if necessary, replace the valves.
Have the electrical connection of the resistors checked to make sure they are in good condi-
tion.
The manufacturer will not recognise any guarantee rights if the “EGO” solar collector with
integrated storage malfunctions because maintenance was not carried out or was carried out
badly, in particular on the safety and one-way valve, the backflow preventer and the electric
resistors.
Programmed maintenance
For every maintenance intervention performed, indicate the date and type of operation.