1
1 Introduction
Throughout this manual, the following symbols will be used to highlight important information and procedures:
Symbol
Definition
Symbol
Definition
WARNING! A dangerous voltage or other
condition exists. Use extreme caution when
performing these tasks.
Meter measurement required.
CAUTION! This information is critical to the safe
installation and or operation of the inverter.
Follow these instructions closely.
Torque rating critical to operation.
NOTE: This statement is important. Follow
instructions closely.
Login to the remote monitoring system
for operating status
1.1 About this Manual
– Target Audience
This manual is intended to be used by qualified service and installation personnel for the purposes of product installation.
This manual contains instructions for the installation and start up sequence of the Eguana Evolve™ home energy storage
system; including the PCS and master battery cabinets. This product is permanently wired to the home electrical service,
and must be installed by a licensed electrician only. This system also includes a combined energy management system
and automatic transfer switch in a separate panel, herein defined as the ACXIS panel. Installation and commissioning
of the ACXIS panel is not covered within the scope of this document, however, it is referenced where necessary for
installation planning.
The ACXIS panel relies on an AC coupled PV solar source to charge the batteries as part of the energy management
control algorithms. A PV solar system must be installed in conjunction with this energy storage system. The ACXIS
panel contains a built-in automatic transfer switch (ATS) to isolate critical loads during a grid outage. When this product
is not in service, critical loads are routed directly to the grid panel via the ATS.
The battery capacity of this system can be expanded by adding additional cabinets adjacent to the master battery cabinet.
Expansion of battery capacity is not covered within the scope of this document. Please refer to the following documents
for comprehensive information to support the Evolve home energy storage system installation.
E-gear ACXIS panel installation guide
Evolve – LE Expansion Battery Cabinet Installation Manual
1.2 Glossary
Term
Definition
Term
Definition
AC
Alternating Current
LED
Light Emitting Diode
ARC
Auto Recovery Circuit
NC
Normally Closed
CPU
Central Processing Unit
NO
Normally Open
DC
Direct Current
PCS
Power Control System (Inverter)
EMS
Energy Management System
PE
Protective Earth
ESD
Electrostatic Discharge
PV
Photo-Voltaic
ESS
Energy Storage System
RF
Radio Frequency
GND
Ground
SOC
State Of Charge (Battery)
SOH
State of Health (Battery)
EMS