3
INSTALL IN THE CENTRE OF CEILING AT LEAST 300mm FROM
LIGHT FITTINGS & WALLS
ENSURE MAINS POWER IS CORRECTLY CONNECTED TO L & N
TERMINALS ON ALL INTERCONNECTED ALARMS - OTHERWISE
UNITS WILL BE DAMAGED
DO NOT FIT ACTUAL ALARMS UNTIL ALL BUILDING WORK IS
COMPLETED TO AVOID CONTAMINATION. AFTER CHECKING
OPERATION, COVER ALARMS WITH DUST COVER UNTIL
REQUIRED FOR USE
DISCONNECT THE ALARMS BEFORE APPLYING HIGH VOLTAGE
TO WIRING (FOR INSULATION TESTS)
DO NOT ATTEMPT TO OPEN THE ALARM AS IT IS PERMANENTLY
SEALED FOR SAFETY
INTERCONNECT ALL ALARMS
B16350-R0-Ei2100 SERIES-U&C.qxd 18/9/08 3:46 PM Page 3