8
Phone:(910) 392
‐
2490
Fax: (910) 392
‐
2123
416 Landmark Drive
Wilmington, NC 28412
www.easterninstruments.com
VERIFY PROPER MECHANICAL INSTALLATION
Verify that the QVT is properly mounted (See “Mechanical Installa on: Moun ng
the QVT” sec on of the QVT I&O Manual for Addi onal Info)
Verify that the High and Low Ports of your
fl
ow element are properly tubed to the
transmi er/manifold/purge system (See “Tubing the QVT” sec on of the QVT I&O
Manual for Addi onal Info)
VERIFY PROPER WIRING OF THE QVT
Verify that the proper power has been supplied to the QVT (See “Wiring the QVT: 4
‐
20 mA Loop Power” sec on of the QVT I&O Manual for Addi onal Info)
If using an RTD to measure the process temperature, verify that the RTD is properly
wired (See “Wiring the QVT: RTD Temperature Sensor Input” sec on of the QVT
I&O Manual for Addi onal Info)
PERFORM ZERO OF THE DP1 DIFFERENTIAL PRESSURE
(See “Procedures: Zero DP1 Di
ff
eren al Pressure Measurement” sec on of the
QVT I&O Manual for Addi onal Info)
VERIFY COMMUNICATION (4
‐
20 mA OUTPUT)
Compare the readings on your PLC/DCS with the values of the output variable
shown of the QVT screen. (Example: 0 lb/hr on the QVT would equate to 4 mA of
output)
QUICK START UP GUIDE