Vertrieb durch
eibe Prod Vertrieb GmbH & Co. KG
| Industriestraße 1 | 97285 Röttingen | www.eibe.de
25
25
After preparing the pit the trampoline can be put on the con-
crete L - shape stones. The remaining gap between the Kids
Tramp and the surrounding area needs to be filled.
The upper 5 – 10 cm should be filled with humus so
that there are no gaps between the trampoline and its sur-
rounding ground.
If the ground does not drain naturally (water - impermeab-
le), suitable drainage must be installed. In this case the pit
should be 15 cm deeper to allow a drainage pipe connected
to a suitable outflow (e.g. the local sewerage system). After
that you disperse a combined frost protection and base
layer on the whole area, depth: 15 cm.
Finally, you concrete the 8 concrete L - shape stones.
Intersection scheme
1.50
1.60
lean concrete
lean concrete
washed grit
16 / 32 mm
concrete L - shape
stones
concrete L - shape
stones
70
40
40
63
31
20
12
10
6
42
16
16
air space
if necessar
y, y
ou ha
ve to
shore up the ground here
if necessar
y, y
ou ha
ve to
shore up the ground here
possible suspension of the bed
existing ground
existing ground
split 2 – 5 mm
split 2 – 5 mm
5
5