background image

checked O

• Are the slide surfaces okay? Use our repair 
kits Laminat (article number 5 63 036 0) to 
touch up damages on the GRP slides and 
Oberfläche (article number 5 63 035 0) to 
revarnish the surface afterwards. The 
Oberfläche repair kit is absolutely sufficient for 
the elimination of minor damages.

checked O

• Are all plastic and rubber components okay?

checked O

• Certain parts (e.g. water pumps) have to be 
shut down and dismantled prior to the frost 
period, and stored according to instructions.

checked O

The following pages of this documentation 
may comprise other information that must be 
considered during the operational inspections, 
for example in the step-by-step installation 
instructions and the sheets on details.
All damages and defects have to be eliminated 
immediately in order to guarantee the safety 
and functional reliability of your µ 
products.

Please remember to enter your results in the 
maintenance report form!

Major Annual Inspection:

You should carry out the "Major Annual 
Inspection” after the winter or at least after 12 
months. In addition to those of the "Monthly 
Operational Inspection”, the following checks 
are required:
• Are all foundations okay and the equipment 
well ancored?

checked O

• If necessary, provide all wooden, metal, 
glazed and varnished parts and components 
with a new finish.

checked O

• Replace joints that show severe corrosions or 
heavy wear and tear.

checked O

• Wooden components: All wooden 
components exposed to weather conditions 
have to be checked. Please pay particular 
attention to the parts planted underground as 
well as to all those components, which are 
essential to the static stability (e.g. cross bars 
on swings, bridge supports, cableway struts) 
of the playground equipment.

checked O

The following pages of this documentation 
may comprise other information that must be 
considered during the operational inspections, 
for example in the step-by-step installation 
instructions and the sheets on details.
All damages and defects have to be eliminated 
immediately in order to guarantee the safety 
and functional reliability of your µ 
products.

Please remember to enter your results in the 
maintenance report form!

552024143..

5 / 10

Summary of Contents for fantallica 552024143 Series

Page 1: ...ce Article pass Guarantee certificate Attention Guarantee Keep these documents in a safe place Please indicate the workshop order number RM Nummer in all inquiries and complaints No UK Hexagon swing R...

Page 2: ...s covers as well as rubber tensioner elements are excluded from the warranty and subject to the legal terms of warranty Powder coatings are excluded from the warranty and subject to what guaranteed in...

Page 3: ...t to wrench and slip onto the screw any regulations regarding impact attenuating Please make sure that all assembly equipment Use a two way drill with enough pull for flooring has been removed before...

Page 4: ...and adhered to for each by more of 1 5cm towards the post see All damages and defects have to be eliminated playground In such schedule all local illustration below the plastic bearing has to immediat...

Page 5: ...r Annual Inspection after the winter or at least after 12 months In addition to those of the Monthly Operational Inspection the following checks are required Are all foundations okay and the equipment...

Page 6: ...adjust see foundation plan close drilled holes with stoppers Cast foundation in situ using concrete type C20 25 Dimensions in cm Drill t drilling depth bore diameter Drill bore diameter waiting time i...

Page 7: ...the equipment C20 25 impact area Impact attenuating surface according to EN 1176 for outdoor playground equipment only Please allow for a distance to other objects of at least 1 5 m all around the equ...

Page 8: ...bject to wear not part of our warranty package circular 552024143 70609 0002 4x 71702 0001 6x 70421 55500312000 6x M 10 007 Z SCH F2 BG04 SCH F5 BG01 6x SCH F5 BG02 6x 12x M12 DIN985 24x M12 DIN125 A1...

Page 9: ...rew connections Wait 14 days Tighten all screw connections Watch marking 3 4 5 6 552024143 2 M12 DIN 125 A13 M8x30 DIN912 VA M8 DIN986 VA 1 SCH F5 BG01 M12 DIN 985 G 0 2 20 m M12x45 DIN 912 SCH F5 BG0...

Page 10: ...Proof of maintenance and repair work Day of inspection Person responsible Verification OK Defects Defects eliminated name date signature 552024143 10 10...

Reviews: