background image

 
 

 

 

 

 
 

EZ250 

 

 

                                           

L                   

Owners Manual 

 

Summary of Contents for EZ 250

Page 1: ...EZ250 L Owners Manual ...

Page 2: ...i ...

Page 3: ...taller 2 Preloaded Eiki Code 3 Preloaded Timer 4 EZ 250 Layout 5 EZ 250 Software Installations 6 Programming EZ 250 7 17 Labeling Buttons 18 19 Installing EZ 250 20 24 DIP Switch Settings 25 EZ 250 Software Troubleshooting 26 EZ 250 Operational Troubleshooting 26 ...

Page 4: ...iii ...

Page 5: ... 1 EZ 250 Parts List EZ 250 AC DC Power Supply EZlink Hub Plug and Play Set Up Guide 2 Screws 2 Label Transparency Sheets ...

Page 6: ... 9 serial cable to connect your computer to EZ 250 Slotted screw driver Hex driver 2 pieces of standard Cat 5 cables to run between the EZ 250 and EZlink Hub The control cable that was included with the projector or that was purchased later DB 9 serial cable if connecting to an NPC 1 ...

Page 7: ... LC XB30 LC SB21 NOTHING FURTHER IS REQUIRED The default button configuration is Button 1 On Button 2 OFF Button 3 Volume Up Button 4 CompositeVid Button 5 Computer 1 Button 6 Black Screen Button 7 Volume Down Button 8 S Video Button 9 Computer 2 Button 10 Auto Image The other EIKI standard configurations can still be accessed without disconnecting the system While the controller is powered up pre...

Page 8: ...ton down The button will blink once then pause for about 3 seconds then it will blink twice then pause for 3 seconds etc After you have arrived at the proper number release the button Each set of blinks loads a different timer option One hour One Blink Two hours Two Blinks Three hours Three Blinks Four hours Four Blinks Five hours Five Blinks Six hours Six Blinks Seven hours Seven Blinks Eight hou...

Page 9: ...1 Hooked up to projector when using NPC 1 also hooked up to another device when NPC 1 is not used or just nothing Contact Closures wires Connects to EZlink 1 on the hub Connects to EZlink 2 on the hub EZllink 1 cable carries Power and both contact closures EZlink 2 cable carries both RS 232 ports RS 232 3 Not Used ...

Page 10: ... 6 EZ 250 software Installation 1 Goto http www eiki com 2 Then select EZ 250 Software 3 Save to your PC 4 Then install the program from your desktop ...

Page 11: ...er 2 Take a DB9 female to a DB9 female cable and plug one end into RS 232 2 port on the interface and the other into your computer 3 Set the dip switches on the EZlink interface see page 25 4 Connect the power supply to the EZlink hub 5 Then choose which level of programming you will need In this section the different ways to program the EZ 250 will be explained Programming using a Saved file 1 Se...

Page 12: ...button is located on the back of the EZ 250 8 After the programming status disappears disconnect the cables from the computer and press the reset button on the back of the EZ 250 and you are ready for the installation of the EZ 250 Standard Programming 1 Select EZ 250 under EIKI by clicking on the start menu then all programs then EIKI and select EZ 250 2 Select Projector from the top of the EZ 25...

Page 13: ...ct Model this will provide default codes to the EZ 250 7 Press the Select Button 8 Select the Upload New Configuration to Control Button Or 9 The software will prompt you to press the reset button reset button is located on the back of the EZ 250 ...

Page 14: ...e back of the EZ 250 and you are ready for the installation of the EZ 250 Standard Programming for 2 Devices 1 Same as steps 1 thru 7 in Standard Programming 2 Select Projector from the top of the EZ 250 software 3 Enable Second Projector 4 Select Projector 5 Select Model 6 Select Control Port 2 7 Select Manufacturer 8 Select Model ...

Page 15: ...ing status disappears disconnect the cables from the computer and press the reset button on the back of the EZ 250 and you are ready for the installation of the EZ 250 Standard Programming for a LSE device and a another Device 1 Same as steps 1 thru 7 in Standard Programming 2 Select Control Ports 3 Select Enable LSE Device this will be on RS232 2 so you must connect your other device on RS232 1 4...

Page 16: ... Advanced Programming Changing button functions is not difficult That said please bear in mind that calling us for service after you have modified the code could make you subject to additional charges 1 Same as steps 1 thru 7 in Standard Programming 2 You now can select what you would like each button to do thru the EZloader Data base by going to the button and clicking on the drop down arrow and ...

Page 17: ...e computer and press the reset button on the back of the EZ 250 and you are ready for the installation of the EZ 250 6 Now you can save the configuration for another install Selecting Contact Closure Use the contact closure feature on the EZ 250 by selecting switch relay and then pick which button will activate the relay and then select which relay 1 or 2 you may have multiple buttons select the s...

Page 18: ...ng section of this manual to learn more Custom Programming 1 Same as steps 1 thru 7 in Standard Programming 2 Type in the custom coding you need for each button by selecting the View Button Detail Reconfigure button under each button 3 Then select the configure button 4 Enter in the number of command including start and end commands ...

Page 19: ...o Control Or 7 The software will prompt you to press the reset button reset button is located on the back of the EZ 250 8 After the programming status disappears disconnect the cables from the computer and press the reset button on the back of the EZ 250 and you are ready for the installation of the EZ 250 ...

Page 20: ... four hours The LEDs on the bottom of the EZ 250 are indicators to let you know how much time is left before the devices shut down The first LED will shut off after 1 hour leaving three lit LEDs indicating that there are three hours left After the second hour only two LEDs will remain lit After the third hour only one will remain lit This state leaves one hour before the devices will shut down At ...

Page 21: ...ol s front panel with a thin blade 3 With a thin blade lift the top up of the lens from the diffuser Diffuser Lens 4 Remove plastic plate that lays in between the lens and the diffuser Plastic Plate Lens Diffuser 5 Place label between lens and plastic plate When reassembling make sure the flat end of the plastic plate faces the lens Black Screen Lens Plastic Plate Diffuser ...

Page 22: ... then open up EZ 250 software 8 After EZ 250 software is open select labels 9 Select layout 10 Select the button you would like to change and click on it then type in the new label 11 After your done customizing the labels select print Use transparencies for best results Note blank transparencies not provided they can be obtained at a local office supply store ...

Page 23: ...port that it was programmed for either RS 232 1 or RS 232 2 on the EZlink interface 4 Connect the power to the EZlink interface do not plug the power into the wall outlet yet 5 Connect the cat5 cables from the interface to the EZ 250 controller Plug one cat5 cable into the EZlink 1 port on the interface and then to EZ1 on the controller Plug the second cat5 cable into EZlink 2 on the interface and...

Page 24: ...t device 2 For the second device pull a DB9 serial cable from the EZlink interface to the second device location 3 Connect the cable that is coming from the device into the port that you selected during programming 4 Set dip switches on EZlink interface see page 25 5 You are ready to control two devices ...

Page 25: ...vice 2 If connecting to another EZ 250 connect a db9 female to female cable between the RS232 2 port on the first EZlink interface and the RS232 2 port on the second EZlink interface 3 Set your dip switches see page 25 4 Plug the power supply into the wall outlet 5 You are ready to control your data projector ...

Page 26: ... 22 Two EZ 250s ...

Page 27: ...programming section Then connect your device into the relays 3 For Example connecting a low voltage screen you would program the on button to switch relay 1 and the off to switch relay 2 4 Place the wire that controls the down into relay 1 along with the ground 5 Place the wire that controls the up into relay 2 along with the ground 6 Now when you turn the control on the screen will come down and ...

Page 28: ... cable from the NPC 1 into the RS 232 2 port of the EZlink interface 5 Connect the power to the EZlink interface do not plug the power supply into the wall outlet yet 6 Connect the cat5 cables from the interface to the EZ 250 controller Plug one cat5 cable into EZlink 1 port on the interface and then to EZ1 port on the controller Plug the second cat5 cable into EZlink 2 port on the hub and the EZ2...

Page 29: ...S 232 2 with a standard DB9 Cable When connecting to devices on either RS 232 1 or RS 232 2 with a null modem DB9 Cable When connecting to RS 232 1 with a standard DB9 cable and connecting to RS 232 2 with a null modem DB9 cable When connecting to RS 232 1 with a null modem DB9 cable and connecting to RS 232 2 with a standard DB9 cable ...

Page 30: ...store factory setup button This will set everything back to original factory specs EZ 250 Operational Troubleshooting 1 If the data projector does not require a null modem connection you make the connections the same as you did at the EZtrol If it does require a null modem connection change the RX and the TX at the EZlink interface by resetting the dip switches 2 Make sure if connecting between EZ...

Reviews: