The  following  procedures  should  be  followed  to  test  the  RM85  for  correct 
operation: 
 

 

1. 

After  unpacking,  examine  all  external  features  to  confirm  damage-
free shipment. Report all defects and damage at once. Ensure the 
correct voltage has been selected. Connect the drainage outlet to a 
suitably sized hose and run the hose to a permanent drain 

 

2.     Setting the Digital Humidistat 

The  Digital  Humidistat  is  factory  preset  to  give  the  optimum 
level  of  control.  Only  adjustment  of  the  desired  set  point  is 
required. 

 
During normal operation, the display shows  the current % Relative 
Humidity within the space being conditioned.  
 
The required humidity level can be set as follows: 

 

Press the “S” button once to access the set point 

 

Press  the 

  or 

  button  to  change  the  display  to  the  

desired Humidity level 

 

Press  the  “S”  button  again  to  save  the  set  point  –  The 

control  returns  to  displaying  the  current  %  Relative 
Humidity  

 
 

2. 

Check dehumidification process as follows: 

 

 
 

 

A. 

Place unit on a level surface. 

 
 

 

B. 

Start up unit by switching to “I”. 

 
 

 

C.   Check that the compressor is running. 

 

 

 

 

D. 

Leave the machine running for 15 minutes. 

 
 

 

E.   Observe the evaporator coils through the front grille, to confirm 

frost  formation. 

 

   

 

i. 

If  the  air  temperature  is  below  25ºC,  an  even  coating  of 

frost should cover the entire evaporator coil.   

 

   

 

ii. 

If the air temperature is above 25ºC, frost and/or droplets 

of condensed water should cover the entire evaporator coil. 

CAUTION: 

DO NOT REMOVE COVERS WHEN UNIT IS IN OPERATION 

Summary of Contents for 10560HD-GB

Page 1: ...Page 1 of 16 Drawing TPC442 Issue 2 Date 24 11 16 DUAL VOLTAGE RM85 H INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL www eipl co uk...

Page 2: ...ly higher temperature with a lower absolute humidity than that which entered Continuous circulation of air through the dehumidifier gradually reduces the relative humidity within the area The RM85H de...

Page 3: ...n be seen through the hole Using a flat blade screwdriver move the switch lever down to the 230 volt position If 110 volt is required the switch lever must be in the upper position Once the required v...

Page 4: ...ing once back shell is removed The voltage selection switch is located on the rear of the electrical panel hanging from the fan deck Choose the correct voltage for the mains supply your unit will be c...

Page 5: ...GWP of refrigerants used in products manufactured by Ebac Industrial Products Ltd is as follows R134a 1300 R407c 1610 For type and weight of refrigerant contained in this unit please refer to the prod...

Page 6: ...ing conditioned The required humidity level can be set as follows Press the S button once to access the set point Press the or button to change the display to the desired Humidity level Press the S bu...

Page 7: ...nd the display will return to its normal reading when the unit returns to dehumidifying mode Fan running If after carrying out the above procedures the unit does not appear to function properly refer...

Page 8: ...ng accompanied by frosting of the thin capillary tubes indicates loss of refrigerant gas or low charge 4 Check all wiring connections including mains cable for damage or loose connections 5 In order t...

Page 9: ...he refrigerant compressor The charging stub should be crimped and rebrazed after servicing NEVER allow permanent service valves to be fitted to any part of the circuit Service valves may leak causing...

Page 10: ...nt air flow 2 Compressor fault 3 Loss of refrigerant gas 1 Check all of the above 2 Contact the Factory Service Center 3 Contact the Factory Service Center Little or no defrost when required 1 Faulty...

Page 11: ...ry 3014254 2 X 2ft 8 Solenoid valve 3020837 1 9 Filter dryer 3020909 1 10 Compressor 3022198 1 11 Defrost Relay 3030269 1 12 Voltage selection capacitor 3030375 1 13 Solenoid coil 3030451 1 14 Humidit...

Page 12: ...oto Protocol The refrigeration system is hermetically sealed The Global Warming Potential GWP of refrigerants used in products manufactured by Ebac Industrial Products Ltd is as follows R134a 1300 R40...

Page 13: ...Page 13 of 16 Drawing TPC442 Issue 2 Date 24 11 16...

Page 14: ...Page 14 of 16 Drawing TPC442 Issue 2 Date 24 11 16...

Page 15: ...Page 15 of 16 Drawing TPC442 Issue 2 Date 24 11 16...

Page 16: ...ww eipl co uk sales eipl co uk American Sales Office Ebac Industrial Products Inc 700 Thimble Shoals Blvd Suite 109 Newport News Virginia 23606 2575 USA Tel 01 757 873 6800 Fax 01 757 873 3632 www eba...

Reviews: