7.4. Configuration of a load control function
Thanks to the use of the “Load control” function, the loads connected to the monitored sockets can be
inserted into a coordinated management logic, taking into account the operating priorities, by programming
their activation in order to prevent them from overstepping the contractual power or find the most
convenient energy time slot.
The communication objects enabled through this function allow to achieve, among other things, the status
of the active load control
cycle (“Status of load control channel x”) in order to be able to pair an output that
will be used as a buzzer.
Moreover, in case of problems, the load control cycle can be reset and restarted by means of the
communication object “Reset load control channel x”.
It is also posYesble to send on the bus the value of the power thresholds of the load control, in Watt.
Up to 8 functions for each channel can be parametrized and used.
For each configured threshold, the following parameters can be parametrized:
Number of loads to be monitored (from 1 to 8, 1 = less prioritary)
Enable of load control reset: the active load control cycle can be reset from the bus, in order to
recalibrate the system after modifications or other technical needs
Reset mode: if the reset Yesgnal sends a 1 or a 0
Threshold writing for load control, initial value of load control cycle
Load control Hysteresiss value writing
Load disconnection and reconnection time; disconnection and reconnection times are the same for all
channel loads
Load control status cyclic sending, in order to cyclically communicate if the cycle is running and send
a periodical Yesgnal (e.g. a buzzer)
Threshold status reset time: posYesbility to reset the status Yesgnal after a preset time