19
4.2.4 Check the forklift for oil leakage.
4.2.5 Check the chain, rollers, fork, oil pipes and horn.
4.2.6 Check the brake.
4.2.7 Check the wear and tear of drive wheels and loading wheels.
4.3 Professional Maintenance Manual
It is very important for safe operation of the forklift to perform overall
professional maintenance. Failure in performing maintenance according to specified
interval may cause malfunction of the forklift, and potential risk to human and
equipment.
Maintenance periods listed in this manual apply to single shift a day under
normal operation conditions. If using in dusty environment, the ambient temperature
varies remarkably or in multi-shift situation, the maintenance period has to be
shortened.
Maintain the stacker according to following maintenance list. Maintenance
periods are as follows:
W1 = Every 50 work hours, but at least once a week.
M3 = Every 500 work hours, but at least once every three months
M6 = Every 1000 work hours, but at least once every six months
M12 = Every 2000 work hours, but at least once every 12 months
Additional operations should be performed in trial run period:
(In initial 50 – 100 working hours or after two months)
— Check the nuts on the wheels, and tighten them if necessary.
— Check the hydraulic components for leakage, and tighten them if
necessary.
—Replace the hydraulic filter.
Summary of Contents for EK13A
Page 2: ...2 Contents...
Page 4: ...4 EK15A...
Page 26: ...26 Perform balanced recharging to accumulator once a month in normal use...