14
9.2 Daily Maintenance
9.2.1 Check every pole, every cable and their covers.
9.2.2Check if the accumulator box is secured.
9.2.3 Check the stacker for oil leakage.
9.2.4 Check the chain, rollers, fork, oil pipes and horn.
9.2.5Check the brake.
9.2.6 Check the wear and tear of drive wheels and loading wheels.
9.3 Professional Maintenance Manual
It is very important for safe operation of the truck to perform overall professional
maintenance. Failure in performing maintenance according to specified interval may cause
malfunction of the truck, and potential risk to human and equipment.
Maintenance periods listed in this manual apply to single shift a day under normal
operation conditions. If using in dusty environment, the ambient temperature varies
remarkably or in multi-shift situation, the maintenance period has to be shortened.
Maintain the truck according to following maintenance list. Maintenance periods are as
follows:
W1 = Every 50 work hours, but at least once a week.
M3 = Every 500 work hours, but at least once every three months
M6 = Every 1000 work hours, but at least o
nce every six months
M12 = Every 2000 work hours, but at least once every 12 months
Additional operations should be performed in trial run period:
(In initial 50 – 100 working hours or after two months)
— Check the nuts on the wheels, and tighten them if necessary.
— Check the hydraulic components for leakage, and tighten them if necessary.
—Replace the hydraulic filter.
Summary of Contents for EP20D Series
Page 12: ...9 6 Electrical Schematic Diagram ...
Page 13: ...10 7 Hydraulic Schematic Diagram ...
Page 18: ...15 ...