Manufacturer: PPHU
EKOLOT
Type: KR-030 TOPAZ
Handling, Maintenance and Periodic Inspections
Manual
Issue: 1
Rev. N
o
:
Date: July 2010
Date:
Page
83
19. In similar way as in the point 17, remove the upper bolts that attach the
engine frame to the fuselage. Observe the position of the engine on the
sling and correct the position if necessary.
9.4.1.2 Installation of the power plant in the airplane
1. Lift the power plant on a sling of SWL 200 kg (see: point 13 of
procedure 9.4.4). Move the engine to the fuselage firewall direction.
2. Install and tighten the upper bolts J.15.250.12.00 that mount the engine
frame to the fuselage. Use the glue for threaded connections and
secure additionally with 1.2 mm safety wire (see the picture 9.4.1.39)
3. Install and tighten the lower bolts J.15.250.12.00 that mount the engine
frame to the fuselage. Use the glue for threaded connections and
secure additionally with 1.2 mm safety wire (see the picture 9.4.1.39).
4. Connect the electrical bonding cable between the fuselage and the
engine frame (compare to the picture 9.4.1.33).
5. Connect the starter cable (compare to the picture 9.4.1.33).
6. Connect the magneto cables (compare to the picture 9.4.1.35)
−
Pull the magneto cables through the eyes in the diagonal former
and the firewall and secure the edges J.14.000.06.00 with the
rubber rings
−
Connect the magneto connectors with the instrument panel socket
Pic. 9.4.1.41