Manufacturer: PPHU
EKOLOT
Type: KR-030 TOPAZ
Handling, Maintenance and Periodic Inspections
Manual
Issue: 1
Rev. N
o
:
Date: July 2010
Date:
Page
84
7. Connect the coolant hose to the surge tank (compare to the picture
9.4.1.30).
8. Connect the oil hose to the surge tank (compare to the picture 9.4.1.25).
−
Tight the barb fitting fitting J.15.254.00.00 to the oil tank
−
Put the breather pipe on the barb fitting and secure with a hose
clamp
−
Tighten the barb fitting nut J.15.255.00.00 to the oil tank
9. Connect the fuel pipe to the fuel pump and the overflow pipe to the
four-way manifold (compare to the picture 9.4.1.23 and 9.4.1.24).
10. Connect the right hose of the engine coolant to the radiator (compare to
the picture 9.4.1.21).
−
Put the hose on the radiator barb fitting
−
Tighten the hose clamps
11. Connect the hot air hose (compare to the picture 9.4.1.20).
−
Put a hose clamp Mikalor W1 50-70 on the corrugated hose (see
the below picture, elements outside the airplane)
−
Put the hose on the air butterfly valve (J.14.010.01.00) located on
the firewall
−
Tighten the clamp
Corrugated hose
GATES
Nr 7743-01060
MIKALOR
W1 50-70
Pic. 9.4.1.42