EKOVENT AB
We reserve the right to make changes
2022-03
6
Installation- and maintenance instructions
Installation of EKO-SUH (Adjustable outlet speed)
(Applies to EKO E-Line size 20-200 and EKO S-Line size 20-100)
EKO-SUH is placed in the roof hood outlet and adapted to its attachment points in the hood.
1. Adjust the EKO-SUH to the desired position and lock with a sheet metal screw in the up-
per edge of the hood.
2. Lock EKO-SUH with blind rivet nut M10 and sheet metal screws.
Calculate the desired area:
A = q/v
v = Desired outlet speed, m/s
q = Available air flow, m
3
/s
A = Outlet area,
m
2
(AxB)
EKO-SUH