- 8 -
INSTALLATION OF FITTINGS AND TUBING
STEP 1
Screw in the two G1/4 threaded male fittings. Attach the liquid
cooling tubes and connect the water-block(s) into the cooling circuit.
EKWB recommends using EK- fittings.
You can use any opening as an inlet/outlet port. Do not forget to
plug the remaining two opening with enclosed EK-Plug G1/4 or
equivalent.
CAUTION: In case of using connectors other than EK- series
compression fittings, take special attention to the length of the
fittings’ male G1/4” thread. 5mm is the maximum allowed G1/4”
thread length!
STEP 1
Tubing
EK- Plug G1/4
EK-Fitting
CHECKING FOR CONTACTS
If necessary temporarily remove the water block to check for uniform
surface contact between the block and the components, pay special
attention to the VRM section of the graphics card. Check whether
the water block makes contact with the intended integrated circuit.
Then repeat sub-steps in previous section to re-attach the block.
In case you fail to obtain good contact, please check again that
your thermal pad thickness or contact our support service at
http://www.ekwb.com/support.