background image

IF101 2Q/4Q

ELBY Designs - Laurie Biddulph

9 Follan Close, Kariong, NSW 2250, Australia

elby-designs@bigpond.com

http://www.elby-designs.com

2 of 3

Construction of the IF101 requires the assembly of 2 boards:-

Column 1 - IF101 PCB (

3D Model

)

Column 2 - Panther Support Pot PCB (

3D Model

)

Constructors should refer to the

Component Overlay

for any

specific comments regarding the board assemblies, the

Bill of

Materials

for the current value of all components and

General

Construction Notes

for general PCB assembly guidelines. You are

advised to check all of these documents on our website to ensure

you have the latest copy.

1. Assemble the Carrier Board assembly (

3D Model

)

2. Fit all components to the boards following normal assembly

guidelines except for all the jack sub-assembly

3. Mount the jack sub-assembly to the Column 2 board and

then offer the assembly up to the front panel and secure the

using the supplied nuts and washers

4. Solder the jack sub-assembly in to place

5. Install the Column 1 board

6. Fit the short IDC cable between the modules

Reviews: