IF101 2Q/4Q
ELBY Designs - Laurie Biddulph
9 Follan Close, Kariong, NSW 2250, Australia
2 of 3
Construction of the IF101 requires the assembly of 2 boards:-
Column 1 - IF101 PCB (
Column 2 - Panther Support Pot PCB (
)
Constructors should refer to the
for any
specific comments regarding the board assemblies, the
Materials
for the current value of all components and
Construction Notes
for general PCB assembly guidelines. You are
advised to check all of these documents on our website to ensure
you have the latest copy.
1. Assemble the Carrier Board assembly (
2. Fit all components to the boards following normal assembly
guidelines except for all the jack sub-assembly
3. Mount the jack sub-assembly to the Column 2 board and
then offer the assembly up to the front panel and secure the
using the supplied nuts and washers
4. Solder the jack sub-assembly in to place
5. Install the Column 1 board
6. Fit the short IDC cable between the modules