background image

INSTALLATION 

WARNING FOR THE USER 
Read carefully the instructions/indications contained in this manual before installing and using the instrument. 
The instrument described in this manual is intended for use by properly trained staff only. 
SAFETY 
This instrument has been manufactured and tested in compliance with EN 61010-1standards. In order to maintain these conditions and 
to ensure safe operation, the person must comply with the indications and markings contained in the manual. When the instrument is 
received, before beginning installation, check that it's O.K. And it has not suffered any damage during transport. When starting 
installation make sure that the operating voltage and mains voltage are compatible with the device instructions. The instrument power 
supply must not be earthed. Maintenance and/or repair must be carried out only by qualified and authorized personnel. If there is ever 
the suspicious that, that there is a lack of safety ,during operation, the instrument must be disconnected and cautions taken against 
accidental use. 
Operation   is   no   longer   safe   when:   -  The   instrument  doesn't   work.   /  -  The  measured   value   are  obviously  wrong   or 
unreasonable  / - There is  clearly  visible  damage.  / - After  serious  damage  incurred during  transport. / - After  a storage  under 
unfavourable conditions 

 

CONNECTION 

For a correct use of the device, the wiring diagram contained in the present manual, must be respected. 
The connections are available on the screw terminal: 

 

- auxiliary power  supply: 
The power supply is take from voltage inputs. 
Are available 3 different auxiliary supply: 

0 - 115V = 100-130V 50-60Hz 

(N-L3) 

(on request) 

0 - 230V = 220-240V 50-60Hz 

(N-L3) 

(on request) 

0 - 400V = 380-415V 50-60Hz 

(L2-L3) 

(standard model) 

It’s possible, for example, to give an auxiliary power supply between phase and neutral, in a 4 wires system, or phase- 
phase in a 3 wires system, without neutral or from a VT in a medium voltage application. 
In the standard  version the voltage  is 400V and it’s  taken between  the phases  L2-L3. 
In the following table it’s possible to see the measurable voltage depending of the type of power supply. 

power supply  terminals

 

rated  voltage

 

range of measurable  voltage

 

400V

 

300÷500V phase to phase (175÷290V phase-neutral)

 

230V

 

175÷290V phase to phase (130÷170V phase-neutral)

 

 

L2-L3 (phase to phase power supply)

 

110V

 

85÷145V phase to phase (50÷85V phase-neutral)

 

230V

 

300÷500V phase to phase (175÷290V phase-neutral)

 

 

L3-N (phase – neutral power supply)

 

110V

 

175÷290V phase to phase (100÷170V phase-neutral)

 

The standard version allows to apply the instrument at all the three-phase network 400V with or without neutral supplied. 

ELM-961 

 

instruction manual

IM441-U v0.6 

pag. 2

 

For example for application on single phase 230V will need the L3-N / 230V. while for applications in medium voltage (for 
example using external voltage transformer 15 / 0.1 kV phase to phase) will need the version L2-L3 / 110V. 

 

- measure voltage  inputs: 
4 terminals are available for the connection to 
the 3 phase and neutral of the network of 
measure, the maximum voltage phase to 
phase   shouldn't   be   over   500   V   rms   and 
dependent  to  the  auxiliary  power  supply.  In                     
case of a 3 phase system without neutral, or 
non  distributed  neutral  to  leave  terminal  N 

ELM-961

 

 

REAR PANNEL

 

 

free. It’s possible to use external voltage 
transformer in fact the transformation rate of 
the external transducer can be set in the 
SETUP  of  the  instrument  and  the 
visualization allows the reading of voltage up 
to 40,0 kV. 

 

- measure current  inputs: 
4 terminals are available for the connection to 

ENERGY COUNTERS

 

 

 

 

 

 

 

 

 

3 external amperometric transformers with secondary 5A, it’s possible to use 2 TA on lines with 3 wires (insertion three 
phase Aron). The utilization of external TA is obligatory. The transformation rate of the external transducer can be set in 
the SETUP of the instrument and the visualization allows the reading of voltage up to 9,99 kA. 

 

REMARKS: It's a must to respect the phase sequence. The connections between current and voltage phase inputs must not be 
inverted (for example, CT placed on phase L1 must correspond to the I1 input). So as it is not correct to invert S1 and S2 terminals, 
since power factors and powers might not be reliable. 
For fixing the flush mount version instrument to the panel, use the fixing devices supplied, by inserting them in the side groves of the 
enclosure and tighten the screws. 
For safety reasons, place an external fuse protection at the input voltages, and use adequate cables for the working voltages and 
currents, with a cross sections from 0,5 to 2,5 mm

2

Summary of Contents for ELM-961

Page 1: ...internal CT digital output in alternative to the serial port serial port in alternative to the digital output power supply different from standard version current input 1A MEASURED PARAMETERS paramete...

Page 2: ...400V 300 500V phase to phase 175 290V phase neutral 230V 175 290V phase to phase 130 170V phase neutral L2 L3 phase to phase power supply 110V 85 145V phase to phase 50 85V phase neutral 230V 300 500V...

Page 3: ...IRES ELM on line with 3 wires without neutral or with neutral not supplied the N terminal must not be connected L1 S1 P1 S1 L2 P1 L3 N S1 S2 P1 P2 LOAD I1 I3 VL1 VL2 VL3 INSERTION ON THREE PHASE LINE...

Page 4: ...N ON SINGLE PHASE LINE I1 I2 S1 I3 VL1 VL2 VL3 if the multimeters are used on single phase line the measure are referred at the L3 phase The others data displayed relatives at value of three phase sys...

Page 5: ...the values of the active reactive and apparent energy counters If it s selected with the A and B keys the display indicates the maximum and average values G display for the visualization of the electr...

Page 6: ...kVAr pulse version with digital output 01 0 kW kVAr pulse 0 10 kW kVAr pulse 0 01 kW kVAr pulse seT TPL Increase from 100 to 500 mS in step by 100 mS Decrease version with digital output seT ID ADR In...

Page 7: ...decrease it press the C key To confirm it press the A key The average time is the time used to calculate the average parameters avg and the maximum demand maxD Programming of the energy visualization...

Page 8: ...rd when required by the instrument at the enter of the setup use the A B and C keys as the same way done previously The menu is cyclic After the last setting the instrument go back to the first page o...

Page 9: ...ALR LO With ALR SYS 123 the digital output will function as alarm verifying that the maximum value of the single phases doesn t exceed the maximum threshold set ALR HI and that the minimum value of t...

Page 10: ...the set SET THE HIGH AND THE LOW THRESHOLDS On F display will appear the message ALR Hi with the high threshold value confirming with the A key on the same display will appear the message ALR LO with...

Page 11: ...ime the B key to select the parameter and the A key to confirm it SET THE THRESHOLD Subsequently it s necessary to set the threshold using the B to increase and C to decrease keys Confirm with A key I...

Page 12: ...all the measures appear on the L3 display Visualization section 2 At the same way of the section 1 press the C button to select the parameter that can be displayed and indicated from E LED The voltag...

Page 13: ...s max maxD avg I L1 max avg I L2 max avg I L3 max avg phase currents maximum of average phase currents max demand max maxD avg W max avg VAr max avg VA max avg three phase power maximum of average thr...

Page 14: ...se speed Not shielded connection As shown in the diagram it is necessary to place a serial RS232 485 converter between the RS232 PC s outlet and the instrument s it s necessary to insert a line termin...

Page 15: ...ELM 961 instruction manual IM441 U v0 6 pag 15 DIMENSIONS ELM 961 96 9 56 cut panel 96 96 R3 92 90 92 20...

Page 16: ...1 to 400 0 current inputs from 0 02 to 5A permanent overload 30 from external TA with secondary 5A primary programmable from 5 to 10000A auto consumption 0 5VA INPUTS OUTPUTS digital outputs Two outpu...

Reviews: