Maintenance
Cleaning the condensate receptacle
Cleaning and refilling the syphon
26
Cleaning the condensate receptacle
•
Remove the inspection hatch (2) to
access the inside of the condensate
receptacle;
•
Clean the receptacle;
•
Mount the inspection hatch.
Cleaning and refilling the syphon
•
Remove the syphon (3)
from the
condensate connection;
•
Clean and fill it with fresh water;
•
Mount the syphon back in the original
position.
1
2
3
Water pressure and quality
Check if the water pressure and quality
meet the requirements. Consult the
chapter “commissioning: water and
hydraulic system” for more detailed
information.
Water flow rate
Check if the water flow rate through the
boiler is within the limits. Consult the
chapter “commissioning: check water
flow” for more detailed information.
Combustion analysis
Check the combustion at full load and
minumum load, correct the settings if
necessary. An additional reference
check at 50% load is recommended.
Consult the chapter “commissioning:
combustion analysis” for more detailed
information.
Gas pressure
Check the dynamic pressure of the gas
supply to the boiler, when the boiler is
running at full load. In case of a boiler
cascade, all boilers should be running
at full load. See technical data for re-
quired values.
Combustion analysis
Check the combustion at full load and
minumum load, correct the settings if
necessary. An additional reference
check at 50% load is recommended.
Consult the chapter “commissioning:
combustion analysis” for more detailed
information.
Gas pressure
Check the dynamic pressure of the gas
supply to the boiler, when the boiler is
running at full load. In case of a boiler
cascade, all boilers should be running
at full load. See technical data for re-
quired values.