Trinox Floor Standing Shell and Tube Boiler
4 L344
©
Elco UK 04/07/2012
The following Codes of Practice are also applicable: -
BS 5449:1990 Specification for forced circulation hot water central heating systems for domestic premises.
BS 6644:2005 Specification for gas fired hot water boilers of rated inputs between 70kW (net) and 1.8MW(net)
(2
nd
and 3
rd
family gases).
BS 6880:1988 Code of Practice for low temperature hot water heating systems of output greater than 45kW.
Parts 1,2 & 3.
BS 6891:1988 Specification for installation of low-pressure gas pipework of up to 28mm (R1) in domestic
premises (2
nd
family gases).
BS 7593:2006 Code of Practice for treatment of water in domestic hot water central heating systems.
BS 7671:1992 Requirements for electrical installations. IEE Wiring Regulations. Seventeenth Edition
CISBE Guide reference sections B7, B11 and B13.
CP342 Part 2: 1974 Code of Practice for centralized hot water supply.
IGE/UP/1 or 1A Gas Tightness Testing & Purging of Commercial Industrial Gas Installations
IGE/UP/2 Gas installation pipework, boosters and compressors on Industrial and Commercial premises.
IGE/UP/4 Commissioning of gas fired plant on industrial and commercial premises.
IG/UP/10 edition 3 Installation of gas appliances in Industrial and Commercial premises.
Part 1: Flued appliances.
This instruction booklet is an integral and essential part of the product .
This appliance must be used for the purpose for which it was specifically intended.
All contractual or non-contractual responsibility of the manufacturer is excluded in the event of
injuries caused by errors in installation, adjustment, maintenance and improper use.
The manufacturer's responsibility is excluded for all damage to persons resulting from a clear risk
for the user which could have avoided by taking suitable safety measures.
After having removed the packaging, check the contents for breakages. If you are in doubt do not
use the appliance, contact your supplier.
Do not leave the packaging materials (wooden cage, nails, staples, plastic bags, polystyrene foam,
etc.) as they are potential sources of risk.
The installation must be performed in compliance with the regulations in force, following the
manufacturer's instructions, by professionally qualified personnel. The term "professionally
qualified personnel" means persons with specific technical skills in the sector of heating systems
and components for domestic use and domestic hot water production.
To guarantee the efficiency of the appliance and ensure correct operation, it is necessary to have
regular maintenance performed by professionally qualified personnel, following the manufacturer's
instructions.
Any repairs to the appliance must be carried out using only original spare parts.
If you decide not to use the appliance for a long period, ensure you have professionally
qualified personnel to carry out the necessary operations to preserve the boiler.