05/2005 - Art. Nr. 13 018 106A
40
VECTRON GL 05.700 DUO PLUS
Gas nozzles: factory setting
On the gas nozzle labelled
A
, 5
outwards-facing slots and 1
inwards-facing slot should be left
covered by sleeve E. Secure the
turbulator with 6
solid
M5x6 screws.
On the gas nozzles labelled
B
, 5
outwards-facing slots and 0
inwards-facing slots should be left
covered by sleeve
E
.
VECTRON GL 05.1000 DUO PLUS
Gas nozzles: factory setting
On the gas nozzles labelled
A
, 5
outwards-facing slots and 1
inwards-facing slot should be left
covered by sleeve
E
. Secure the
turbulator to the gas nozzles labelled
A
using 3
solid
M5x6 screws
On the gas nozzles labelled
BF
, 5
outwards-facing slots and 0 inwards-facing
slots should be left covered by sleeve
E
.
Secure the turbulator to the gas nozzles
labelled
BF
using 3
hollow
M5x6 screws.
Nozzle line position
Checking the mixing unit
·
If the gas connection is on the left and
the burner housing below the axis of
the burner head, the whole nozzle line
must be rotated through 180°. The
same applies if the gas connection is
on the right and the burner housing
above the axis of the burner head. To
do so, remove the turbulator. Unscrew
screw
A
completely. Rotate the nozzle
arm through 180° and refit.
·
Check the nozzle size; replace if
necessary, in accordance with the
table on p. 42.
·
Check and adjust the position of the
ignition electrodes and the turbulator.
Fitting the mixing unit
·
Withdraw UV cell
1
.
·
Release and remove the mixing unit
cover by unscrewing the three Allen
screws
4
.
·
Check the gas connection O-ring.
·
Fit the mixing unit and tighten with
screw at side (M10 counter nut and
Allen screw).
·
Fit the extension rod with 0-40 scale
(loose in accompanying pack) for
setting the turbulator.
·
The extension rod must be pushed
into the steel sleeve until it makes
contact.
·
Pass the ignition cables through
the opening and press in the
rubber grommet.
·
Screw down the cover, connect the
ignition cables
2
and flame monitor
1
.
·
Fit the 2 copper tubes
(accompanying pack; stage 1
marked blue)
3
between the pump
and the nozzle line.
N.B.: Grip the nozzle line firmly
when tightening the coupling nut.
Assembly
Checking / setting
Mixing unit for natural gas