background image

CBR-Test 50 
24-9150 

 

 

 
 

 
Original Instructions 

9901X0237 Issue 5 

 

 
 
 
 

 

 
 
 

Figure 2 

Summary of Contents for CBR-Test 50

Page 1: ...ax 44 0 1525 249249 email ele eleint co uk http www ele com ELE International a division of Hach Lange Ltd Distributor ELE International Soiltest Product Division PO Box 389 Loveland CO 80539 USA phone 1 800 323 1242 fax 1 970 663 9781 email soiltest eleusa com http www eleusa com In the interests of improving and updating its equipment ELE reserves the right to alter specifications to equipment a...

Page 2: ...uctions 2 9901X0237 Issue 5 Contents Section Page Figure 1 3 Figure 2 4 1 Safety 5 2 Introduction 5 3 Specification 6 4 Installation 6 5 Controls 7 6 Operation 7 7 Maintenance 8 Declaration of Conformity Noise Certificate WEEE Directive ...

Page 3: ...ctions 3 9901X0237 Issue 5 LOCKING NUTS ALIGNMENT STUDS ADJUSTMENT NUTS LOAD RING COLUMN CROSSHEAD PENETRATION PISTON PLATEN SURCHARGE WEIGHTS DOWN OFF UP SWITCH STABILISING BAR CBR MOULD MAINS POWER LIGHT FIGURE 1 PENETRATION DIAL GAUGE ...

Page 4: ...CBR Test 50 24 9150 Original Instructions 4 9901X0237 Issue 5 Figure 2 ...

Page 5: ...UPPLY SWITCHED OFF Any contrasting Color FUSE FOR SAFE OPERATION OF THE EQUIPMENT USE ONLY FUSES WITH RATINGS SPECIFIED Green or Black Earth ground TERMINAL Not for safety earthing purposes but provide an earth reference point Background Yellow symbol and outline Black Caution risk of electric shock Background Yellow symbol and outline Black Caution refer to accompanying documents Any contrasting ...

Page 6: ...mber always lift with your legs not with your back If you have a history of back or cardiovascular problems do not attempt to unpack or lift the CBR 50 The machine should be installed on a level bench capable of supporting CBR 50 s gross weight and with sufficient space for safe operation of the equipment The machine is provided with adjustable feet to compensate for any out of level or unevenness...

Page 7: ... machine and the Mains ON OFF switch is switched to ON 5 3 DOWN OFF UP switch This controls the platen movement In the central position the drive motor is OFF When the machine is switched to run either up or down the corresponding direction indicator light will illuminate Important ensure that the motor has stopped before reversing platen direction This may take approximately 5 seconds Failure to ...

Page 8: ... the ON OFF switch at the rear of the machine POWER light illuminated 6 9 Switch the machine to UP Up arrow illuminated 6 10 At the end of the test switch to central OFF position and allow the motor to stop 6 11 Important ensure that the motor has stopped before reversing platen direction This may take approximately 5 seconds Failure to allow the motor to stop when changing platen direction may ca...

Page 9: ......

Page 10: ... Measurements recorded noise level Position A 51 dB Position B 55 dB Position C 54 dB Position D 51 dB Position E 54 dB Normal operator position Background Noise level 38 dB 1 Metre A 1 Metre C 1 Metre B D 1 Metre Noise Test Certificate Issued By ELE International Date of Issue 1 November 2001 ELE doc ref 9901X0237 Date of Test 1 November 2001 ELE International Chartmoor Road Chartwell Business Pa...

Page 11: ...DIRECTIVE ON WASTE ELECTRICAL ELECTRONIC EQUIPMENT WEEE ...

Page 12: ......

Reviews: