8
7. Fix the v-flaps and converter onto the outlet.
8. Hold up the hood, 16pcs M4*10 big flat screws will be
used to connect the hood body into angle iron.
9. Put the expansion pipe on the
converter; after ensure all the
things ok, put down the hook, take
from the outside chimney, all the
installation is finished.
Note:
the expansion pipe is not
included in the product.
Summary of Contents for eiqislandled
Page 15: ...15 PRODUCT FICHE ...