Testing the Manual Step Function
Continuing from the previous procedure:
•
Set Clock Enable to
OFF
.
¾
The LEDs should “freeze”.
•
Set Invert B to
OFF
.
•
Set Pattern Switch 1 to
ON
or “
1
”.
•
Set Pattern Switch 9 to
OFF
or “
0
”.
•
Press the Manual Load Switch.
¾
Pattern LED 1 should illuminate, all other pattern LEDs should be off.
•
Set the 8X2/16X1 Switch to
16X1
.
•
Press the Manual Step LED.
•
Pattern LED 2 should illuminate and all other pattern LEDs should be off.
•
Keep pressing the Manual Step Switch.
¾
The illuminated LEDs should step up smoothly, without skipping any stages, each
time the Manual Step Switch is pressed. In this mode the illuminated LEDs
should cycle from Stage 1 through Stage 16, advancing one step each time the
Manual Step Switch is pressed.
Testing the Gate Bus Switches, Merge Switches and LEDs
Continuing from the previous procedure:
•
Set all of the Gate Bus Switches to
Gate Bus 2
(middle position).
•
Set all merge switches to the
OFF
position.
•
Press the Manual Load switch.
¾
Pattern LED 1 should illuminate, all others should be off.
•
Set Clock Enable to
ON
.
¾
The Master Gate Bus LED should flash with each clock pulse. The Gate Bus 2
LED should flash with each clock pulse. The Gate Bus 1 LED and the Gate Bus 3
LED should both remain off.
•
Set the Merge 2 Switch to
ON
.
¾
The Master Gate Bus LED should flash with each clock pulse and the Gate Bus 2
LED should stay constantly illuminated with no flashing. The Gate Bus 1 and
Gate Bus 3 LEDs should both remain off.
100