18
Installation manual
6.3
Three-phase connection
Demount the cover panel from the supply unit. Connect the earth and other wires as shown.
380–415V 3N~ 3.2kW
bn
BK
GY
bu
BN
L2
N
L1
BK
BN
GY
X1
L1
L2
L3
N
PE
E2
1.6kW
E1
1.6kW
1,2
1,2
E3
1.9kW
1,2
4,5
4,5
4,5
N
L1
PE
L2
L3
200–240V 3~ 5.1kW
bn
BK
GY
bu
BN
L2
L3
L1
BK
BN
GY
X1
L1
L2
L3
N
PE
E2
1.6kW
E1
1.6kW
1,2
E3
1.9kW
1,2
1,2
4,5
4,5
4,5
L1
PE
L2
L3
380–440V 3~ 5.1kW
bn
BK
GY
bu
BN
L2
L3
L1
BK
BN
GY
X1
L1
L2
L3
N
PE
E2
1.6kW
E1
1.6kW
1,2
E3
1.9kW
1,2
1,2
4,5
4,5
4,5
L1
PE
L2
L3
440V 3~ 2.6kW
bn
BK
GY
bu
BN
BK
BN
GY
L2
L3
L1
X1
L1
L2
L3
N
PE
E2
1.6kW
E1
1.6kW
1,2
E3
1.9kW
1,2
1,2
4,5
4,5
4,5
L1
PE
L2
L3
380–415V 3N ~ 5.1kW
bn
BK
GY
bu
BN
BK
BN
GY
L2
L3
L1
X1
L1
L2
L3
N
PE
E2
1.6kW
E1
1.6kW
1,2
E3
1.9kW
1,2
1,2
4,5
4,5
4,5
N
L1
PE
L2
L3
When the installation is completed remount the cover panel and check:
• That the drum is empty.
• That the machine operates by connecting the power to the machine and start a program with heat.