30
electrolux
built-in installation
Sticking the seal in the rabbet
•
Clean the rabbet in the work surface.
•
Stick the one-sided self-adhesive
sealing tape supplied onto the upper
surface of the rabbet along the edg-
es of the cut-out section.
–
Cut the sealing tape into four piec-
es relating to the length of the edg-
es of the rabbet.
–
For the four corners of the rabbet
the ends of the sealing tapes must
be cut into mitres. Do not stick the
ends over one another.
–
Stick the sealing tape flush into the
corner of the rabbet, so that no sil-
icon compound can get under the
glass ceramic when grouting.
–
Don’t stretch the tapes when stick-
ing them on.
•
If installing flush with the work sur-
face, use the sealing tape with di-
mensions 10x3mm.
Summary of Contents for 38TCIO
Page 1: ...user manual Induction wok 38TCIO ...
Page 2: ...We were thinking of you when we made this product ...
Page 25: ...installation general electrolux 25 Installation general ...
Page 26: ...26 electrolux installation proud of the work surface Installation proud of the work surface ...
Page 28: ...28 electrolux installation proud of the work surface ...
Page 29: ...built in installation electrolux 29 Built in installation 10mm x 3 mm ...
Page 31: ...electrolux 31 Rating Plate 941 177 662 220 240 V 3 2 kW 59 WOK 01 AG 38TCIO 50 60 ELECTROLUX ...
Page 35: ......