 When unpacking the range, do not 

discard the 4 shipping bolts. These are to be replaced on 
the unit for use as leveling legs and height adjustments.

NOTE:

1.  The back of the range may be installed directly 

against the wall.

2.  To reduce possible scorching of vertical walls and 

to minimize potential fire hazards under abnormal 
surface unit use conditions such as high heat or 
no pans and to conform to A.G.A. requirements, 
a minimum of 2 1/2" (6.4 cm) spacing should be 
provided on both sides of the cooktop.

Preparation

Figure 10

Check Operation

Refer to the Use and Care Guide and the Electronic Oven 

Control Guide packaged with the range for operating 

instructions and for care and cleaning of your range.

Remove all packaging from the oven before testing.

1.  Install Burner Bases and Burner Caps
 

This range is equipped with sealed burners as shown 
(see Figure 11).

a.  Unpack burner bases and burner caps.
b.  Place burner bases over each gas opening.
c.  Make sure the burner is properly aligned and 

leveled. Place burner caps over appropriate 
burner bases.

Figure 11

Gas

Opening

Burner Cap

Burner

Base

Electrode

NOTE:

  There are no burner adjustments necessary  

 

on this range.

Excessive Weight Hazard

• Use  2  or  more  people  to  move  and  install 

range.

• Failure to follow this instruction can result in 

back or other injury.

1.  Put on safety glasses and gloves. Remove oven racks 

and parts package from inside the oven. Remove 
shipping materials, tape and protective film from the 
range.

2.  Take 4 cardboard corners from the carton. Stack 

one on top of another. Repeat with other 2 corners. 
Place corners lengthwise on the floor in back of the 
range to support range.

3.  Firmly grasp the range and gently lay it on its back 

on the cardboard corners.

4.  Remove and save the 4 shipping bolts from the skid. 

Discard skid.

5.  Install 4 shipping bolts as leveling legs.
6.  Lay a large piece of cardboard in front of the range. 

Carefully stand the range upright on cardboard.

7.  Adjust the leveling legs to a point where the range 

base does not touch the floor.

Leveling the Range

Level the range and set cooktop height before 

installation in the cut-out opening (if applicable).

1.  Install an oven rack in the center of the oven.

2.  Place a level on the rack (see fig. 10). Take 2 readings 

with the level placed diagonally in one direction 

and then the other. Level the range, if necessary, 

by adjusting the 4 leveling legs with a wrench (see 

Figure 14).

3.  Slide range into cut-out opening and double check 

for levelness. If the range is not level, pull unit out 

and readjust leveling legs, or make sure floor is level.

Summary of Contents for 40"

Page 1: ... bottom of the cabinet when the bottom of wood or metal cabinet is protected by not less than 1 4 0 64 cm flame retardant millboard covered with not less than No 28 MSG sheet metal 0 015 0 4 mm stainless steel 0 024 0 6 mm aluminum or 0 020 0 5 mm copper 30 76 2 cm minimum clearance when the cabinet is unprotected Do not pinch the power supply cord between the range and the wall Do not seal the ra...

Page 2: ...1A latest edition or with local codes Air curtain or other overhead hoods which operate by blowing a downward air flow on to a range shall not be used in conjunction with gas ranges other than when the hood and range have been designed tested and listen by an independent test laboratory for use in combination with each other Make sure the wall coverings around the range can withstand the heat gene...

Page 3: ...utral grounding If local codes permit connection of the frame grounding conductor to the neutral wire of the copper power supply cord see Figure 3 1 Remove the 3 screws at the lower end of the rear wire cover then bend the lower end of the rear wire cover access cover upward to expose range terminal connection block see Figure 2 Figure 1 3 Wire Power Supply Cord Kit 3 Wire Wall Receptacle Electric...

Page 4: ...move the three loose nuts after you removed the rubber band on the terminal block using a 3 8 nut driver or socket 3 Remove the grounding strap from the terminal block and from the appliance frame 4 Connect the ground wire green of the copper power supply cord to the frame of the appliance with the ground screw using the hole in the frame where the ground strap was removed see Figure 4 5 Connect t...

Page 5: ...liminate the risk of burns or fire by reaching over heated surface units cabinet storage space located above the range should be avoided If cabinet storage space is to be provided the risk can be reduced by installing a range hood that projects horizontally a minimum of 5 12 7 cm beyond the bottom of the cabinet Figure 8 Figure 7 Follow instructions for the type of installation you have Center Lin...

Page 6: ...duit 4 flare union adapter 5 pressure regulator The gas supply line to the shutoff valve should be 1 2 or 3 4 solid pipe The user must know the location of the main shutoff valve and have easy access to it When using flexible gas conduit on the range allow sufficient slack to pull the range outside the cutout for cleaning or servicing NOTE Do not allow the flexible conduit to get pinched between t...

Page 7: ...serious injury or property damage The qualified agency performing this work assumes responsibility for the conversion Failure to make the appropriate conversion can result in personal injury and property damage Any additions changes or conversions required in order for this appliance to satisfactorily meet the application needs must be made by an authorized Sears Service Center Distributor or Qual...

Page 8: ... adjustments necessary on this range Excessive Weight Hazard Use 2 or more people to move and install range Failure to follow this instruction can result in back or other injury 1 Put on safety glasses and gloves Remove oven racks and parts package from inside the oven Remove shipping materials tape and protective film from the range 2 Take 4 cardboard corners from the carton Stack one on top of a...

Page 9: ...ing However it is suggested that you verify the operation of the electronic oven controls once more Refer to the Use and Care Guide for operation Follow the instructions for the Clock Timer Bake Broil Convection some models and Clean some models functions When checking oven element operation do not touch the elements They will be hot enough to cause serious burns Bake After setting the oven to 350...

Page 10: ... rear legs to align with brackets 6 After installation verify that the anti tip bracket is engaged Open and remove drawer and check to make sure the anti tip bracket is engaged Important Safety Warning To reduce the risk of tipping of the range the range must be secured to the floor by properly installed anti tip brackets and screws packed with the range Those parts are located in a plastic bag in...

Page 11: ...11 40 DUAL FUEL RANGE INSTALLATION INSTRUCTIONS Models with Electric Ovens and Gas Cooktop NOTES ...

Page 12: ...s materiales lesión personal o la muerte PARA SU SEGURIDAD No almacene ni utilice gasolina u otros vapores y líquidos inflamables en la proximidad de éste o de cualquier otro artefacto QUE DEBE HACER SI PERCIBE OLOR A GAS No trate de encender ningún artefacto No toque ningún interruptor eléctrico no use ningún teléfono en su edificio Llame a su proveedor de gas desde el teléfono de un vecino Siga ...

Page 13: ...nado de la una con la otra Asegúrese de que el material que recubre las paredes alrededor de la estufa pueda resistir el calor generado por la estufa Antes de instalar la estufa en un área cuyo piso este recubierto con linóleo u otro tipo de piso sintético asegúrese de que éstos puedan resistir una temperatura de por lo menos 90 F sobre la temperatura ambiental sin provocar encogimiento deformació...

Page 14: ...ede ocurrir corte de energía o pérdida de conexión eléctrica NOTA La estufa bi energiá viene de fábrica preparada para funcionar con un hueco de 1 1 8 de diámetro come se muestra en la figura 3 En caso de necesitarse un hueco más grande retire la cubierta Conexión Eléctrica de la Estufa Este aparato se fabrica con el terminal neutro conectado al marco Refiere al diagrama de alambraje de esta cocin...

Page 15: ... conectado directamente al cortacircuito a la caja de fusibles o a la caja de empalmes use un cable blindado flexible o no metálico recubierto de cobre con alambre a tierra Provee una abrazadera releva de anclaje homologo UL a cada extremidad del cable A la extremidad del electrodoméstico el cable pase a través del agujero de la conexión directa vea figura 4 en el cable de la placa de montaje El t...

Page 16: ...ocar superficies sobrecalentadas se debe evitar colocar espacio para armarios de almacenamiento sobre las estufas con elementos al descubierto Si se instalan armarios sobre la estufa se pueden reducir tales riesgos instalando una campana purificadora que se proyecta horizontalmente un mínimo de 5 12 7 cm más afuera de la parte inferior de los armarios Follow instructions for the type of installati...

Page 17: ...sellar todas las conexiones del gas Si se usan los conectores flexibles asegúrese de que no estén enroscados Para verificar si hay fugas en el electrodoméstico se debe de seguir las instrucciones del fabricante Asegúrese de que no haya escapes de gas Después de conectar la estufa al suministro de gas compruebe el sistema con un manómetro Si no tiene un manómetro abre el gas y use un detector de fu...

Page 18: ...una conversión apropiada puede resultar en lesiones graves y daños a la propiedad La instalación y el servicio de mantenimiento deben ser efectuados por un instalador calificado la agencia de servicio o el proveedor de gas La mudanza del aparato para reparaciones o limpieza Apague la corriente eléctrica a la estufa a la fuente de poder principal y apague la válvula de cierre manual de gas Asegúres...

Page 19: ...ra el cuidado y limpieza de su estufa Quite todo el embalaje de la unidad antes de comprobarla 1 Instale las tapas de los quemadores y de las tapas de los quemadores Esta estufa esta equipada con quemadores sellados como se muestra más abajo Figura 11 a Desembale las basas de los quemadores y las tapas de los quemadores b Coloque una basa de quemador sobre cada abertura de gas c Asegúrese que el q...

Page 20: ...a en la fábrica antes del transporte Sin embargo sugerimos que Ud verifique el funcionamiento de los controles del horno una vez más Véase el Manual del Usuario para la operación Siga las instrucciones par el Reloj Minutero Cocer Asar Convección algunos modelos y las funciones de limpieza algunos modelos Al verificar el funcionamiento de elemento de horno no toque los elementos Ellos tendrán el ca...

Page 21: ...e alineen con los soportes 6 Después de haber realizado la instalación verifique que la fijación anti inclinación está empotrada Abra la gaveta retire la gaveta y verifique para asegurarse que está empotrada Importante Advertencia de Seguridad Para reducir el riesgo de que la estufa se vuelque es necesario asegurarla al piso instalando los soportes antivuelco y los tornillos suministrados con la e...

Page 22: ...INSTRUCCIONES DE INSTALACIÓN PARA LA ESTUFA DE FUEL DUAL DE 40 Para modelos con un horno eléctrico y una estufa a gas 22 NOTAS ...

Page 23: ...23 INSTRUCCIONES DE INSTALACIÓN PARA LA ESTUFA DE FUEL DUAL DE 40 Para modelos con un horno eléctrico y una estufa a gas NOTAS ...

Page 24: ...24 WIRING DIAGRAM DIAGRAMA DE LA INSTALACIÓN ALÁMBRICA Models with Electric Ovens and Gas Cooktop Para modelos con un horno eléctrico y una estufa a gas ...

Reviews: