Solid Wall
Dropping from other side of wall
Solid Wall
Chasing-up through wall
Installing the Pipework
MP
Inlet
Screw attaches inlet to MP
Screw in side flange of MP
into raw plug in blockwork
LV cable split in two
joined to screw
connectors in inlet
FLOOR
VOID
Floor-mounted inlet with
pipework in timber joist floor
Floor-mounted inlet with
Pipework in solid floor
Mounting plate (MP)
Screw-in top & bottom
flanges of MP into raw
plug in blockwork
Inlet
Screw attaches inlet to
MP
LV cable split in two
joined to screw
connectors in inlet
Pipe
Sharp 90°
bend
Cable tie
Sweep 90°
bends
LV Cable
Pipe
Low Voltage Cable
Pipe bracket with cable
holder
Sharp 90° bend
Coupler
CV pipe runs around outside
of room in insulation layer.
PIPE HIDDEN IN
BACK OF CUPBOARD
Inlet
Floor covering
notched for inlet
recessing
Mounting Plate
Coupler
UFH pipe in screed
Sharp 90°bend is
first bend after
inlet
g
g
Inlet
Floor has been notched
out to allow inlet to be
recessed
MP with flanges
removed & screws
connecting to inlet
Sharp 90° bend
Pipe bracket
7