SOI/DT 2002-07 eb
19
599 35 36-69
5.4 Delicates Cycles: cold – 30
°
- 40
°
(without options)
Phase N. Function
Time /
control
Movement
Heat.
°
C
Notes
Delay
- Delayed start
Delay time
No Mov
Drain
0 Drain
VAE + 2”+
6” pause
No Mov
1 Water fill
P1 + QPW1 (*)
2 Cold
wash
5’
D55 from full
Refill:
P1
3 Water fill
QPW2 (*)
4 Heating T
30
Cold = 20
°
C
5 Movement
3’
D55
P
re-
w
a
sh
6 Drain
VAE + 15”
No Mov
7 Delicates water fill
P1 + Qdw1 (*)
D55 from full
8 Cold
wash
1’
D55
Refill:
P1+Qdw2
9 Heating
T
20/30/40
10 Maintenance
10’
20-10/
30-27/
40-37
11 Heating
T
20/30/40
12 Movement
10’
D55
13 Drain
VAE
No
Mov
Wa
sh
14 Drain
1’
D55
15 Water fill
P1+ Qrd1 (*)
D55 from full
16 Movement
5’
D55
Refill:
P1
17 Drain
VAE
No
Mov
1st
rinse
18 Drain
1’
D55
19 Water fill
P1+ Qrd1 (*)
D55from full
20 Movement
5’
D55
Refill:
P1
21 Drain
VAE
No
Mov
2nd
rinse
22 Drain
1’
D55
23 Water fill
P1
24 Movement
30”
25 Time water fill
Qrd2 (*)
26 Movement
3’
D55 from full
Refill:
P1
27 Drain
VAE
No
Mov
28 Drain + spin
3,8’
DEL_CF
(450/700 rpm)
R
in
s
es
Last rinse
(softener)
29 Untangling
1’
N55
SW W1D00102
Notes:
P1
time needed to 1
st
level water fill
(*)
time water fills are changeable and calculated by the electronic on the basis of the delivery rate
(see specific table)
T
time needed to heat the water at the set temperature
”
seconds
‘
minutes
VAE
time needed to drain the water till “empty” position of anti- boiling (safety heater) pressure
switch
Movement
: this column describes the drum movements at low speed and during spin (see paragraph “drum
movements”). The length of drain phases with spin cycle is approximate and does not take into
consideration the antiunbalance and antifoam safety systems.