Data di emissione:
Febbraio, 2019
Revisione:
6
Pag. :
7/28
!Caution!
T
o avoid electrical shock or contact with
moving parts, before proceeding with the
disassembling operations, make sure all
switches are in “OFF” position and that the
main power supply is disconnected.
-
S
witch off the machine and disconnect the
power cable.
-
R
emove the main cover.
-
W
ash and sanitize your hands and forearms.
-
U
nscrew the bowl knobs (fig.5).
-
R
emove the accessory to give a “star”
peculiar shape to the dispensed product (fig.6).
-
S
imultaneously press the two securing tabs
and lift the tap to extract it from its seat (see
fig.7).
-
D
isassemble the tap by keeping the body
pressed down and slipping the lever from its
seat (fig.7).
!Caution!
T
o prevent bacteria growth, remove all
o-rings when cleaning.
F
ailure to do so could create a health
hazard.
-
P
ull the tank outward, as shown, to
completely remove it from its seat (fig.8).
Fig. 5
Fig. 6
Fig. 7
Fig. 8
Summary of Contents for GT1 Push
Page 1: ...Data di emissione Febbraio 2019 Revisione 6 Pag 1 28 GT1 e GT2 Push Operator s manual ...
Page 22: ...Data di emissione Febbraio 2019 Revisione 6 Pag 22 28 14 WIRING DIAGRAM ...
Page 23: ...Data di emissione Febbraio 2019 Revisione 6 Pag 23 28 ...
Page 24: ...Data di emissione Febbraio 2019 Revisione 6 Pag 24 28 ...
Page 25: ...Data di emissione Febbraio 2019 Revisione 6 Pag 25 28 ...
Page 26: ...Data di emissione Febbraio 2019 Revisione 6 Pag 26 28 ...
Page 27: ...Data di emissione Febbraio 2019 Revisione 6 Pag 27 28 ...