487 18 39 01 - 300/500/750 - GB
Installation - gas heating
Gas installation
Test run
Connect a manometer to the measuring branch (2).
(See page regarding gas valves.)
Select a program that uses heat.
Start the machine.
Check the nozzle pressure, see table.
If necessary, adjust the setting screw (4) of the regu-
lator under nipple (3).
Check that the gas is burning evenly and with a
bluish flame.
After testing, prepare the machine for use.
Changing to natural gas/ bottled gas
Mount the supplied nozzle (1); see table.
Connect a manometer to measuring branch (2).
(See gas valve pages.)
Select a program that uses heat.
Start the machine.
Set the nozzle pressure using adjusting screw (4)
under nipple (3).
Check that the gas is burning evenly and with a
bluish flame.
Fit the nipple (3).
After testing, prepare the machine for use.
42
Summary of Contents for TT300
Page 1: ...Operating and installation manual TT300 TT500 TT750 487 1839 51 01 99 31 ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 18: ...Instructions for use 18 487 18 39 01 300 500 750 GB ...
Page 26: ...General installation 487 18 39 01 300 500 750 GB 26 ...
Page 38: ...Installation electric steam and gas heating 487 18 39 01 300 500 750 GB 38 ...
Page 46: ...Installation electric steam and gas heating 487 18 39 01 300 500 750 GB 44 2 ...