28
Installation manual
Caution
Only for machines with weighing equipment.
Place the machine on a perfectly even surface and horizontal.
Control this using a water level (see drawing).
Each point must be level.
Weighing equipment: P
Water level: N
Fixing dowels: C
Flange safety locks: B
Mark the place of the drilling hole for the fixing dowels (C) and drill the holes for fixing of flanges (holes
⌀
12 mm (1/
2″), depth 80 mm (3″)). Put the dowels in the flanges, position the flanges and screw.
12 Remove of the transport locks fitted
Important
Before putting the machine into service, it is compulsory to remove the 4 transport locks fitted.
To do so, remove the front and rear casings, then the fixing screws of the transportation bridles (B).
Keep the transport locks fitted with their screws and bolts to be able to assemble them again in case you would need
to lift the machine.
Summary of Contents for WHB5 500H
Page 2: ......
Page 4: ......
Page 21: ...Installation manual 21 Back view Right view Drain connection Top view ...
Page 42: ...42 Installation manual ...
Page 45: ......