The designs of electrical heating systems
must be executed according to the design
directives for explosive conditions, basing
on the manufacturer’s recommendations
and supervised by qualified experts.
Heating systems must be executed in full
accordance with the Instructions herein,
and the installation must be performed
by an authorised electrician.
Before undertaking any maintenance works /
repairs / alterations, read the specification
of the heating system.
The specification of the heating system
should be stored for any heating circuit,
as long as the system is in use.
Note:
4
CAE-PROi
Summary of Contents for CAE-PROi
Page 2: ...CAE PROi 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18...
Page 12: ...CAE PROi 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18...
Page 22: ...CAE PROi 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18...
Page 24: ...2 24 CAE PROi...
Page 25: ...1 Z1 5 6 7 25 Z2 4 3 45 mm 2 1 2 3 4 5 6 7...
Page 26: ...1 2 3 T1 26 CAE PROi 1 2 3...
Page 28: ...20 mm A1 A2 28 CAE PROi 20...
Page 29: ...15 min 15 mm A3 A4 29...
Page 30: ...A5 A6 30 CAE PROi...
Page 32: ...CAE PROi 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18...
Page 39: ...www elektra eu ESG EN 423 Grupa V5 05 19 0 1 r...