19
EN
Operating and assembly instructions RDF
www.elektror.com
9016315 01.20/12
The manufacturer,
Elektror airsystems gmbh
Hellmuth-Hirth-Strasse 2
D-73760 Ost
fi
ldern
hereby declares that the product to which this declaration refers meets the basic requirements of the Machinery Directive
(2006/42/
EC)
as set forth below.
Description of incomplete machine:
Conveying blower RD 14 F, RD 4 F, RD 5 F, RD 6 F, RD 62 F, RD 64 F,RD 74 F, RD 82 F
Serial number and year of manufacture can be found on the rating plate and on the accompanying delivery slip.
Description of the essential requirements of Machinery Directive (2006/42/EC), with which the partially completed machine
complies:
Machinery Directive
(2006/42/EC)
: Annex I, Articles 1.1.2, 1.1.3, 1.1.5, 1.3.2, 1.3.3, 1.3.4, 1.3.7, 1.5.1, 1.6.1, 1.7.1, 1.7.3
Electromagnetic Compatibility Directive
(2014/30/EU)
Eco-design Directive for Energy-related Products
(2009/125/EC)
The partially completed machine described here continues to ful
fi
l the protective regulations of the
Low Voltage Directive
(2014/35/EC)
according to Annex I, No. 1.5.1 of the Machinery Directive.
The commissioning of the partially completed machine is not permitted until it has been veri
fi
ed that the machine in which the
partially completed machine is to be installed, complies with the provisions of the Machinery Directive
(2006/42/EC)
.
The following harmonised standards were applied:
DIN EN ISO 12100 2011
Safety of machinery - General principles of design -
Risk assessment and risk reductio
n
DIN EN 60034-1
2011
Rotating electrical machines,
Part 1: Rating and performance
DIN EN 60034-5
2007
Rotating electrical machines,
Part 5: Degrees of protection provided by the integral
design of rotating electrical machines (IP code) – Classi
fi
cation
DIN EN 60204-1
2019
Safety of machinery – Electrical equipment of machines,
Part 1: General requirements
DIN EN 60664-1
2008
Insulation coordination for equipment within low-voltage systems,
Part 1: Principles, requirements and tests
The manufacturer, Elektror airsystems gmbh, undertakes to make the special documentation on this incomplete machine available,
electronically or in hardcopy, to national authorities on demand. The special technical documentation belonging to this incomplete
machine was prepared in accordance with Annex VII Part B.
Mr Kevin Kargar, tel. +49 711 31973-1179, is responsible for the documentation.
Kreher (Managing Director)
Ost
fi
ldern, 17.01.2020
8 DECLARATION OF INSTALLATION CONFORMITY PURSUANT TO ANNEX II 1 B
DECLARATION OF CONFORMITY IN ACC. WITH EVPG (ENERGY CONSUMPTION
RELEVANT PRODUCTS ACT).SECTION 4 PARAGRAPH 1