28
INSTALLER INFORMATION
Commissioning the appliance
A soundness test MUST be made before the
installed stove is left with the customer.
Ensure that the fire is burning at full rate for a
minimum of 5 minutes to warm the flue.
If there are problems, the flue may require
attention.
The stove will produce an odour and/or smoke
for the first few hours of use. Please ventilate
the room. Also please note that during this initial
burning period, a grey dust deposit will be formed
on the inside of the window, please clean this
before leaving the appliance with the customer.
Gravel Arrangements / Blackstones /
Brilliants
Ensure that the Grate , is sitting firmly in the base
of the fire box, with the long slot in the centre of
the Grate aligning with the centre slots on the
Burner Tube. The Pilot flame must be visible
through the
grate and the cut-out in the Pilot Shield.
Scatter evenly the Gravel over the top of the
Grate and Burner. Make sure that some holes
of grate are still visible. Ensure that none of the
gravel enters the pilot enclosure.
The Gravel arrangement is now complete,
How-
ever, it is important to check that no stones
have entered the pilot area and the cross
lighting is good before the glass is replaced.
Gravel Arrangement
Detail showing
Pilot Area with
no gravel
Summary of Contents for Bidore
Page 15: ...15 installer information ...
Page 16: ...16 installer information ...
Page 17: ...17 installer information ...
Page 18: ...18 installer information ...
Page 34: ...34 Technical drawings techniCAL INFORMATION Trisore 95 Bidore 95 ...
Page 35: ...35 technical information Bidore 70 Trisore 70 ...
Page 40: ...40 Element4 B V Paxtonstraat 23 8013 RP Zwolle The Netherlands ...