5. Operation
5-1. Preparation & Caution Before
Measurement
1. The function switch should be set to the range to be
measured before operation.
If the function must be switched during a
measurement, always remove the test leads from
the circuit being measured.
2. If the unit is used near noise-generating equipment,
be aware that the display may become unstable or
indicate large errors.
3. Avoid using the unit in places with rapid temperature
variations.
4. In order to prevent damage or injury to the unit,
never fail to keep the maximum tolerable voltage and
current, especially for the 10A current range.
5. Carefully inspect the test leads. If damaged, discard
and replace.
6. Be sure to check the annunciator on the display for
safety indicator.
5-2. Front Panel Description
1. Liquid Crystal Display
2. Function/Rotary Switch
3. TR h
FE
Test Socket
4. 10A Input Jack
5. Plug-in Connector for Red (positive) Test Lead.
6. Plug-in Connector for Black (negative) Test Lead.
1
2
6
3
5
4
-8-
-9-
Summary of Contents for M-1000B
Page 9: ...1 2 6 3 5 4 9...