5. Operation
5-1. Preparation & Caution Before
Measurement
1. The function switch should be set to the range to be
measured before operation. If the function must be
switched during a measurement, always remove
the test leads from the circuit being measured.
2. If
the
unit
is
used
near
noise-generating
equipment, be aware that the display may become
unstable or indicate large errors.
3. Avoid using the unit in places with rapid
temperature variations.
4. In order to prevent damage or injury to the unit,
never fail to keep the maximum tolerable voltage
and current, especially for the 10A current range.
5. Carefully inspect the test leads.
If damaged,
discard and replace.
6. Be sure to check the annunciator on the display for
safety indicator.
5-2. Front Panel Description
1. Liquid Crystal Display
2. Function/Rotary Switch
3. TR h
FE
Test Socket
4. 10A Input Jack
5. Plug-in Connector for Red (positive) Test Lead.
6. Plug-in Connector for Black (negative) Test Lead.
1
2
6
3
h
FE
Test
Socket
5
4
-8-
-9-