9
•
Install the integral blower:
a.
From the inside of the hood, slip motor into the
attachment slot on the left.
b.
Rotate motor upwards until it snaps into the spring
clip on the right.
c.
Secure the motor to the hood with 2 machine screws
on integral blower fixing nuts.
d.
Plug connector into the motor.
Important:
Connector ends are designed to mate
only one way. Match flat and round connectors as
shown.
•
Install the grease filters supporting frame:
a.
lift the frame to cover the blower housing.
b.
Secure it to the body of the hood with 6 screws.
•
33" & 45” model only:
Install the Filter trim bracket
in the mid of the grease filter suppeorting frame:
a.
First frontwards, inserting the tabs
b.
Then rearwards using 2 knobs supplied
Connecting the ductwork
•
Install ductwork, making connections in the direction of
airflow as illustrated.
•
Push duct over the exhaust outlet.
•
Wrap all duct joints and the flange connections with duct
tape for an airtight seal.
•
Make the same connection in the wall or ceiling vent exit.
IMPORTANT: Remove the light bulbs before installing
the supporting frame. Refer to the maintenance section
for instructions.
•
Re- install the light bulbs.
Summary of Contents for EOR627SS
Page 6: ...6 Dimensions and Clearances 27 33 39 45 ...
Page 19: ...19 Dimensions et Dégagement 27 33 39 45 ...
Page 33: ...33 Dimensiones y Espacios libres 27 33 39 45 ...
Page 43: ......