9
Install framing for hood support
•
If drywall is present, mark the screw hole locations.
Remove the template.
•
Cut away enough drywall to expose 2 vertical studs at
the holes location indicated by the template.
Install two horizontal supports at least 4" X 2" between
two wall studs at the bottom and upper mounting holes
installation location.
•
The horizontal support must be flush with the room side
of the studs.
Use cleats behind both sides of the support to secure to
wall studs.
•
Reinstall drywall and refinish.
IMPORTANT- Framing must be capable of supporting
100 lbs.
Mounting the hood
WARNING:
2 people are required to lift and position the
hood onto the mounting screws.
•
Place the template on the wall along the horizontal line,
make sure the template is leveled and centered with the
centerline.
•
Mark “upper” screw holes locations in the wall.
•
IMPORTANT.
Check to be sure that hole locations are
leveled and correctly centered by the vertical centerline.
•
Drive “upper” wood screws by hand. Leave ¼ “ of
distance between the screw head and the wall.
•
Remove the grease filter and mount the hood onto the
“upper” screws.
•
Mark “lower” wood screw holes locations in the wall
using a pencil.
•
Remove the hood.
•
Drive “lower” wood screws, by hand. Remove screws.
•
Mount the hood onto the “upper” screws.
•
Drive and tighten the “upper” wood screws, by hand.
•
Drive and tighten the “lower” wood screws, by hand.
Connecting the ductwork
•
Install ductwork, making connections in the direction of
airflow as illustrated.
•
Push duct over the exhaust outlet.
•
Wrap all duct joints and the flange connections with duct
tape for an airtight seal.
•
Make the same connection in the wall or ceiling vent
exit.
Summary of Contents for EPC632SS
Page 6: ...6 Dimensions and Clearances ...
Page 26: ...26 Dimensions et Dégagement ...