8
INSTALLATION
BEFORE THE INSTALLATION
PANELS OPENING
It is possible to open the steel panels, which
cover the grease filters, by slightly pulling on
a side of the panel itself, as shown in Fig. 1.
To achieve the complete opening of panels, you
need to release the safety chains, by using the
appropriate spring catches.
Before starting the appliance installation,
please check that all components are not
damaged, in such a case contact your retailer
and do not carry out installation.
INSTALLATION
Fit a false ceiling with an opening that has the
following dimensions:
41”15/16 x 26”3/16 with a minimum distance of
13” between the ceiling and the false ceiling.
After having chosen the most suitable position,
prepare the ducting: an air outlet connection
piece, with a diameter of 6” to be installed in
the side selected, is provided with the
appliance.
Leave any unused exhaust outlets closed. As
shown in fig.2.
Draw the outline of the hole to house the
ceiling-mounted hood on the solid ceiling as
shown in Fig. 3 according to the model chosen.
Make 4 holes in the ceiling according to the
dimensions as shown in Fig. 4, place the metric
plugs provided in the holes.
Summary of Contents for ESNX43S1
Page 2: ...2 ...
Page 36: ...LIB0142425A Ed 10 18 ...