33
English
Caution:
Maintenance should be always carried out with the engine turned off.
Caution:
Always wear safety gloves when performing maintenance. Safety goggles may
be required for certain operations. These are supplied with the machine.
11.2 Maintenance schedules
11.2.1 Lubricants
Engine (1.1l)
SUNOCO SUPER DENALUBE
SAE 20 W 50 API SF / CC
Hinges
NOVATIO WHITE SUPREME GREASE
Wheel axles
SUNOCO MULTI-PURPOSE GREASE LR
- EP2
11.2.2 Special maintenance
A. Special maintenance of the blades
Once mounted on the blade shaft, the blades will settle into position after a short break-in
period. This can cause the tension on the bolts to decrease, with the risk of the blades becoming
dislodged in between the blade plates. This can cause irrevocable fatigue failure of the blade
shaft and must be prevented by scheduling extra maintenance after a brief running-in period.
WHEN:
Within the first five operating hours after commissioning the new machine
Within the first 5 hours after reversing the blades
Within the first 5 hours after replacing the blades.
WHAT:
Check the torque of the bolt connections securing the blades and tighten them as
required (torque: 25 Nm).