ASSEMBLY OF THE GREENHOUSE UNIT
PROCEDURE:
1.
With the help of a willing assistant, stand
up the rear gable and one of the sides.
Standing on the inside of the structure with
the gutter facing away from you, insert the
eave/gutter bar into the gap between the
corner bars, so that the inside flanges which
form the angle of the roof and side line up
with the bolt slots in the corner bars.
(Key
point).
2.
Loosen the nuts holding the bolts you inserted into the alternative bolt slot of the corner bar
during door end and rear end assembly and slide them into the slotted holes in the flanges of
the gutter (see diagram) Put a nut on the top bolt, put the side diagonal brace on the bottom
bolt and then the nut and tighten up. Repeat the procedure at the bottom where the built in
base and corner bar meet.
3.
Now stand up the door end assembly and repeat the above procedure for all 4 corners of the
greenhouse.
4.
Stand up the other side frame and repeat the operation outlined above at both corners.
Summary of Contents for 7'5" WIDE TITAN
Page 1: ......
Page 2: ......
Page 3: ......
Page 9: ...WELL DONE YOU HAVE SUCCESSFULLY COMPLETED THE 2 SIDE FRAMES ...
Page 11: ...REAR END ASSEMBLY ...
Page 16: ...DOOR END ASSEMBLY ...
Page 32: ...ELITE 1806 ...