B Brick base
There are a number of small angle brackets in the pack of fittings, these are to be bolted onto the
upright glazing bars at the point where the cills are attached to them. Before bolting them to the
frame, first mark the brickwork where the holes are to be drilled. Drill the holes with a masonry bit
and insert the plastic plug. Secure the small angle to the uprights and screw through the hole in the
angle into the plug as illustrated. The structure is now ready for the final sealant. There is a tube of
silicon and a skeleton gun in the pack which you can now use to seal between the wall bars and
ridge and the brick wall.
FITTING THE DOOR TRACK
1.
The door track has a continuous bolt channel in the flat section of the bar. Slide 3 bolts into
the bolt channel and line up with the 3 holes in the previously inserted door track support.
(See door end gable assembly section of this booklet).
2. Loosely add the nuts and slide the door track left or right so that it covers the area of the door
in the open and closed position
Summary of Contents for KENSINGTON 10 x 6
Page 1: ......
Page 2: ......
Page 3: ......
Page 17: ...DOOR FRAME...
Page 36: ...6 WIDE LT TOUGHENED GLASS PLAN Glass pane for standard door on gable end Louvre on rear end...
Page 39: ...OPTIONAL EXTRAS RAIN WATER KIT FOR GUTTERING...
Page 40: ...ELITE 1407...